Case Ref: 15177/24IT(IW)-DM | Tribunal: Industrial Tribunal (Northern Ireland) | Heard: 12–13 May 2025, Belfast | Judge: Employment Judge Wimpress
Outcome: Award of £31,962.46 against the second respondent (Pronto Engineering) for automatic unfair dismissal following a service provision change under the Service Provision Change (Protection of Employment) Regulations (Northern Ireland) 2006.
Claimant represented by: Christopher Mallon BL, instructed by Thompsons Solicitors (NI) LLP.
Colin Bell had worked as an SSES Level 2 Software Engineer and ICA Technician since 1 June 1990 — a continuous employment spanning 33 years. His work centred on a contract between his employer, Scotts Electrical Services Limited (R1), and Northern Ireland Water (NIW). Under that contract, Northern Ireland was divided into nine geographical areas, and Mr Bell was based in Lisburn covering Areas 2, 3 and 4 (the South East, from South Belfast to Armagh).
In May 2023 NIW restructured its framework by splitting the nine areas into three Lots and inviting fresh tenders. Crucially, the framework documentation stated in terms that TUPE does apply (para 2.4.1) and required tenderers to confirm they had read and priced for all TUPE obligations as a pass/fail condition (para 7.3). R1 retained Lot 1 (Areas 1, 8 and 9). Pronto Engineering Group Limited (R2) was awarded Lot 2 (Areas 2, 3 and 4) — the very area Mr Bell had worked in for years.
R1 took the position that Mr Bell's employment automatically transferred to R2 on 11 December 2023 by virtue of a service provision change (SPC). R2 flatly rejected the transfer, contending that:
Mr Bell found himself in legal limbo: R1 said he was R2's employee; R2 said he was still R1's. He attended a meeting with R2, corresponded with both employers, and raised unresolved grievances. When he did not attend R2's premises on 11 December 2023, R2 argued this amounted to an objection to transfer. Neither employer paid him after that date.
The tribunal applied the five-stage framework from Enterprise Management Services Ltd v Connect-Up Ltd [2012] IRLR 190, EAT:
The central battleground was whether Mr Bell's allocation to Areas 2, 3 and 4 was deliberate or coincidental. R2 argued it was happenstance — he simply worked near his home. The tribunal rejected this emphatically.
The evidence showed that R1's Director of Operations, Mr Mayne, deliberately and intentionally allocated Mr Bell to Lot 2. This was a conscious business decision, not a geographic accident. The tribunal drew on the distinction articulated in Eddie Stobart Ltd v Moreman [2012] IRLR 356: it is not enough that an employee happens to carry out the majority of their work for a particular client — the organisation must be intentional, with the principal purpose of servicing that client.
Mr Mallon's submissions drew the tribunal's attention to a critical analytical error in R2's case: R2 had conflated the question of whether there was an organised grouping with the separate question of whether the claimant was assigned to it. These are analytically distinct inquiries and must be approached individually.
R2 placed considerable weight on the fact that Mr Bell did not perform on-call work. Under the new NIW contract, on-call was scored at 20 marks in the tender and R2 argued it was a fundamental pillar of the service.
The tribunal was unpersuaded. The evidence demonstrated that on-call work:
The tribunal held that the method by which on-call work was delivered was a matter for the employing contractor. The fact that Mr Bell had agreed with R1 not to perform on-call work did not remove him from the organised grouping, nor did it mean the pre- and post-transfer activities were not fundamentally the same.
R2 relied on Clearsprings Management Ltd v Anker [2009] to argue that the division of the NIW contract into three lots constituted fragmentation, taking the case outside the SPC provisions. The tribunal rejected this. The activities performed before and after the service change were the same — the geographic restructuring did not fundamentally alter their nature.
One of the most practically significant passages in the judgment concerns R2's argument that Mr Bell's failure to attend its premises on 11 December 2023 amounted to an objection to transfer under Hay v George Hanson (Building Contractors) Ltd [1996] IRLR 427.
The tribunal refused to draw this inference. Mr Bell had:
Both employers had effectively "washed their hands" of him. In those circumstances, the tribunal found it was not realistic to expect Mr Bell to present himself for work with R2. There was no direct evidence that his non-attendance was an exercise of his right not to transfer.
| Date | Event |
|---|---|
| Jun 1990 | Mr Bell begins employment (continuous service date) |
| 2019 | Mr Bell transfers to R1 (Scotts Electrical) via TUPE when R1 wins NIW contract |
| 25 May 2023 | NIW puts restructured three-lot framework out to tender; TUPE stated to apply |
| Nov 2023 | R2 (Pronto Engineering) awarded Lot 2 (Areas 2, 3 & 4); R1 retains Lot 1 |
| 1 Nov 2023 | R1 notifies R2 of TUPE candidate (Mr Bell) for Lot 2 |
| 7 Dec 2023 | R2 formally rejects TUPE transfer of Mr Bell in writing |
| 8 Dec 2023 | R1 maintains TUPE applies; Mr Bell left in legal limbo |
| 11 Dec 2023 | Transfer date — Mr Bell does not attend R2's premises; neither employer pays him |
| 19 Feb 2024 | Mr Bell secures new employment (end of loss period) |
| 12–13 May 2025 | Full hearing before Industrial Tribunal, Belfast |
| 2025 | Judgment issued — £31,962.46 awarded against R2 |
| Head of Loss | Amount |
|---|---|
| Basic Award (33 years' service; 19 yrs × 1.5 × £669 + 1 yr × £669) | £19,735.50 |
| Holiday Pay (1.83 days accrued) | £314.76 |
| Notice Pay (4 weeks × £860 gross) | £3,440.00 |
| Loss of Pension Contributions (9 weeks × £25.80) | £232.20 |
| Loss of Earnings (11 Dec 2023 – 19 Feb 2024; 9 weeks) | £7,740.00 |
| Loss of Statutory Rights | £500.00 |
| Total Award | £31,962.46 |
This case carries important lessons for anyone involved in a service provision change — whether as an outgoing contractor, incoming contractor, or employee caught in the middle.
For incoming contractors (transferees):
For outgoing contractors (transferors):
For employees:
| Case | Principle |
|---|---|
| Enterprise Management Services Ltd v Connect-Up Ltd [2012] IRLR 190, EAT | Five-stage SPC test |
| Eddie Stobart Ltd v Moreman [2012] IRLR 356, EAT | Organised grouping must be intentional, not happenstance |
| Ceva Freight (UK) Ltd v Seawell Ltd [2013] CSIH 59 | Single employee can constitute organised grouping |
| Rynda (UK) Ltd v Rhijnsburger [2015] EWCA Civ 70 | Single employee organised grouping confirmed by Court of Appeal |
| Churchill Dulwich Ltd v Metropolitan Resources Ltd [2009] IRLR 700 | Additional functions by new contractor unlikely to negate SPC |
| Clearsprings Management Ltd v Anker [2009] | Fragmentation may take case outside SPC — rejected on facts here |
| Hay v George Hanson (Building Contractors) Ltd [1996] IRLR 427 | Objection to transfer can be by words or deeds — rejected on facts here |
This case analysis is provided for general information only and does not constitute legal advice. If you are involved in a TUPE dispute — whether as an employer or employee — Christopher Mallon BL accepts instructions and can advise and represent you from the outset.
Continue reading
Christopher Mallon BL is an employment barrister and is happy to discuss your matter in confidence.